Automated CRT Screen Line

 


The CRT Screen Line placed the phosphor screen on the inside of the CRT and involved about 10 major manufacturing processes. When electrons strike the phosphor screen the "green" visible trace that is typical of CRT's is produced.
The original concept was to duplicate the existing manufacturing equip and then to replace the operators with a series of robots.  An alternative architecture was presented that integrated a clean room conveyor system with varying pieces of process equipment.  The alternative was accepted with a significant cost savings.  The final result was approximately 52 machines of various sizes and complexities. 
To present a variety of different bulb shapes and sizes so that there was a consistent interface with the equipment, a universal carrier was developed.  This carrier, (shown on the right below) was relatively inexpensive but was required to repeatedly survive 450 Deg C temperatures:


Chemical Mixing and distribution:

When Potassium Silicate was dispensed into a "cushion" of Barium Acetate the result is a precipitate that forms the phosphorus screen on the inside of the CRT.  The mixtures needed to be precisely controlled.  Contamination was a primary concern.   In previous designs, long lengths of distribution tubing was suspected to attribute to contamination, so an important aspect of the configuration was to keep the distribution system as short as possible and to move the bulbs by the filling station.  The  chemical mixing and dispensing equipment is shown below.


Dispensing, settling, decanting and drying:

The Chemical mixture was required to "settle" for 30 minutes.  At the end of this time the remaining solution was carefully decanted as a thin phosphor layer remained attached to the inside of the face plate.  After decanting the phosphor layer was dried. The dispensing, settling, decanting and drying operations were all built into a single machine.  The air dry nozzles, (shown at the bottom-center of the picture) tracked along with the constant belt speed, (shown in the lower center of the picture) via a servo system:


First Inspection and rework:

The next step was to visually inspect every screen.  A rotary inspection table, (shown below) presented the bulb to the inspector.  If the bulb was accepted it would continue on to the next process, (to the right).  If a defect was detected the bulb would be routed to an automatic reclaim station and then back to the input of this production line, (towards the top of the picture).  This approach was adopted because the output quality of the process was less than the overall requirement of the production line.   The automatic rework-rerouting required very little additional labor cost while meeting the overall yield requirements for the line:


Lacquer Layer Deposition:

A microscopic cross section view of the phosphor layer would appear to look like a series of mountains and valleys.   Ultimately a thin aluminum layer will be deposited that is supported only by the tops of the "mountain" peaks.  To accomplish, this a lacquer layer is deposited to create a network of "bridges" over the "valleys".  The first step to create the "bridges" was to fill the "valleys" with water.  A very thin coating of the lacquer  then "floated" on the bottom surface of the water.  The amount and distribution of the water and lacquer was controlled by spinning  the bulb at the correct speed and time.  After the lacquer is sprayed and spun, a set of drying nozzles entered the tubes to "set" the lacquer.  Immediately exiting the spray station, the parts enter into the lacquer dryer, (shown on the right of the picture below) where the water was evaporated out from under the thin layer of water, leaving only the lacquer bridge network.

Aluminum Vapor Deposition:



Once the water was removed from under the lacquer, aluminum was deposited over the surface of the lacquer.  The Aluminum Vapor Deposition station is shown below.   Along the back of this station is a "fixed" linear robot.  This robot received unprocessed parts from the left, loaded it into the available "aluminizer" and then forwarded the aluminized bulb onto the Lacquer Bake Out oven, (shown towards the back of the picture). 
The load station over the top of each of the aluminizers could hold two bulbs.  One position for the bulb in process and a second position for handing off and receiving the next bulb.
Another major feature was the number of aluminizers.  The process flow rate only requires three units.  However, previous aluminizers were relatively undependable and required minor maintenance about every 20 "shots".  To avoid interruptions in the production line an additional aluminizer was added.  This allowed for any three units to be in operation while a 4th station could be removed, maintained and replaced. 
The aluminizers themselves represent fairly advanced applications of technology.  Each aluminizer incorporated a complete high vacuum system including a roughing pump, a "Cryo" pump and all the necessary instrumentation.  The engineer that designed these units earned a patent for a very unique heating process which used an electron beam and a graphite crucible.  While the classical use of tungsten filaments required frequent  maintenance, the graphite crucibles processed thousands of parts before needing to be replaced.

Lacquer Burn Out:

Once the aluminum layer was deposited the lacquer was "burnt" out from under the aluminum.  This processed left a very thin layer of aluminum supported only the "peaks" of the grains of phosphor screen.  The advantage of the aluminum layer was that since it had close to a mirror finish a much larger percentage of light was reflected forward when electrons struck the phosphor layer. Not only was the light generation efficiency improved but the aluminum layer also dissipated heat which helped prevent burning spots in screen.
Similar to the Frit oven, the technique to closely control the temperature profile in the oven was to implement a number of heat control zones.  This oven had 10 zones, which allowed for a tight profile to be obtained in less than 30 minutes.  Each zone was comprised of a temperature controller, (shown below) a heater and a recirculation fan:

Since the overall process time through the oven was approximately 3.5 hours, an equipment failure could present a potential loss of product and production time.  To address this issue, the oven was specified to have an individual electrical disconnect switch for each fan and heater, (shown below).  This allowed safe repairs to be made while the oven remained in production:

Lacquer Oven Storage:

Because the lacquer oven process took 3.5 hours, considerable logistic issues could occur at the beginning and end of shifts.  The solution to this problem was the proposal of the lacquer Oven Storage module.   This module stored slightly more bulbs than the oven could hold.  This allowed the oven to continue to operate at the end of the shift.  Instead of the finished modules being sent onto the next production line, they would automatically be shifted into the storage module.  Approximately 3.5 hours after the shift ended the storage module would be full, the oven would be empty and everything would shut down.  The next morning, the oven would pre-start approximately 30 minutes before the shift, but the oven would be empty.  About 3.5 hours after the beginning of the shift, the new bulbs would begin to exit the oven.  During the 3.5 hour delay, the previous shifts parts would be drawn out of the storage module to prevent any interruption in the flow of the bulbs.  The end view of the storage module, (empty) is shown below:

General Design Features:



The overall line included approximately 750 inputs and outputs, motors, sensors, solenoid valves etc.  Three large electrical control cabinets were distributed throughout the production line.  4x4 electrical gutters were also installed throughout the line to allow for easy installation of the electrical components, (shown along the top of the below picture).  The electrical gutter greatly improved the initial installation as well as accommodating any changes or additions to the production line.
An addition item of interest may be the air exhaust system, (shown by the grey PVC pipe in through the middle of the picture).  Because of the oil that is exhausted from pneumatic systems, all valves exhausted air into this exhaust system.  Models of direct acting valves were selected to help preserve the air quality of the clean room.


Summary:


More than 30 operators were involved with the original manual production line and the yields averaged about 60%.  The completion of the automated line reduced the number of operators to only 3 or 4 with greater than 98% yields.
Once the general architecture of the production line was defined, a set of specifications were written for each machine module. This greatly assisted in the coordination of a team of between  3 to 6 engineers and designers who worked together approximately 18 months until the line was commissioned.  The cost of engineering was approximately 15% of this $1.5M project, (early 1980 dollars).  Coordination included working with a numerous inside and outside shops and resources.

 